Sunday, May 5, 2013

SPRING HAS SPRUNG...

THE WINTER HUNG ON GAMELY, long and cold.  Spring had the occasional moment and certainly her foot in the door.  Now it is Spring, Spring, and more Spring!

I got the Kitchen Remodel out of the way just in time although it is still somewhat of a shambles in the below-deck Sun Room, with bits and pieces of timber piled up here and there, waiting to trap the unwary foot.  I have 15 or so flower plants on the go and around 20 trees at various stages of infancy.  There are certainly signs of a certain 'cluckiness' in me as I transfer the plants from inside to outside in the morning and back in at night.

So...the switch from inside to outside has definitely taken place.

Four dwarf firs had been transferred, a week ago, from their most unfavorable placement in the shadow of the north-side of the house and now stand sentinel duty alongside the sidewalk, leaving just the holly plants and the lone Azalea along the immediate house front.

 I was sure they would not survive the transplant and they were poorly rooted we (my friend Walt and I) were not able to get much of a root ball.  However, with proper soil, mulching and watering, they seem to be hanging on.  They join a small fir further into west lawn area (excuse, if you can, the auditory pun), from my good friend Uma's home.  It will eventually dwarf them.

Also, two mulberry trees were delivered mid-this-week and duly planted near the east-side fence.  These are American Black mulberries and I hope they will show the large, long black fruit that is the hall mark of this variety.  I love mulberries, the fruit of heaven!

The hollies have been severely pruned and moved to better positions now that the firs have gone.

I am sure that little of this will grasp your attention for long.  The purpose of  all this planting is to further unite the house with its living environment.  The trees will act of provide shade and direct the breezes.  It will take a while for all this to sort out, since trees are not at all like Jack's magic beans and do not grow overnight.  At 76 this month, I am unsure of how much of all this I will see, hopefully all of it.  Just the doing of it will get me there.

As I signed for the house on my birthday (May 29, hint, hint!) and moved in on June 1, this will make just two years that the house and I have been made one.  It is a bit like a marriage, I suppose, since the house certainly has much that is old, borrowed, blue, or new.

The garden will be slow progress, so postings to this Blog may become few and far between.  There will be a modest remodel of the upper bathroom.  It needs light and I can make do with just one bath (there is a nice one downstairs) so it will be come a 'shower room' rather than a 'bath room'.  Sometime  in early Summer will see this work done.  Also awaiting me, the painting of the exterior.  An immediate project is to entice the humming birds to my rear deck.  Somewhat more interesting, perhaps.

Though you will not hear much of it, the work of the garden will ultimately be the more fundamental and I hope to enjoy the gradual development of a 'mini-forest' as my surrounds.


Friday, April 12, 2013

UPDATE II: MODEST KITCHEN REMODEL

IT SEEMS I AM NEARING the end of this phase of the partnership between me and The House.  Today I got the last bits of the floor finished.  I was so pleased that I went out and had a couple of Martinis and a glass of very dry Riesling, interspersed with a dip and, later, NY Cheesecake with strawberries.  Very much restored, I returned home and turned to begin this posting.

Looking back on the last posting, I see that I had not resolved how the painting would go.  This eventuated as a continuation of the basic color I have used on the eastern wall of this extended room...Cloud Burst, a sort of blue/grey that matches the skies we often see here in Corning. It is a very dense color and does well when broken up by other features (vs. and entire wall... which could be very depressing).  This brought me to the question of what to do with the floor.

I had thought to use linoleum tiles and muddled along for a while trying various combinations.  Then, Daniel (my contractor, who pays me the compliment from time to time that I am a person of vision; ah... flattery, how pleasant it is!)  told me I could use a floating vinyl floor that could just sit on the existing floor.  As it turned out, this changed the course of history, at least as far as my kitchen remodel was concerned.

Finally I settled on planks in the theme of Vintage Ash.  An outrageous color, one might think, but one that maintains the theme of Cloud Burst on the walls and cabinet panels but also picks up the Crushed Orange of the trim.  Once the flooring arrived (another story too complicated to tell), it burst on me that I would have to pull up the old linoleum (actually two layers) to avoid too much of a height mismatch between the floor in the living area and this new area. One and a half days of work with the heat gun and I had a heap of old linoleum out on the deck and down to the sub-floor once more.  Up till now, there have been three successive layers of floor covering in this room, plus layer of 3/16 in ply, all shoddily done I might say.  Hooray for the blessings of heat guns is all I can say of this dreary episode!

To end a possibly exceedingly boring  narrative, I revert to a Before and After approach.  Here is what we began with.  Some things must have seemed like a good idea at the time, but from the moment I set eyes on that peninsula of cabinetry protruding so rudely into the living space, I knew it would have to go. Besides hiding the defunct dishwasher, it just got in the way all the time!  This pic was taken February 18, around 2 PM, so you can see how pleasant was the fall of light through the French Doors.  That cursed peninsula made it almost impossible to access the cupboards nearest the doors.

 This gives you a good view of the floor.  Outside, the sky is indeed of the Cloud Burst variety, with rain most of the day.  I am glad that I persisted with this color, avoiding the Grass Mat possessing the long  western wall.  I allowed the Crushed Orange that you can see around the doors and along the bottom of the green wall to intrude into the cabinetry in this section.  This runs throughout the upper two main rooms and passageway between, rather like the lifeblood of the house.

When I first began to lay the floor, I thought the color a tad dense and somewhat boring.  What could I have been thinking,? I said to myself at the end of the first day's work.


With this style of floating floor,  the planks  stick to each other (the temperature has to be at about 68 deg. F.).  One has just one chance to get it right as it sticks better then Tar Baby (see the Uncle Remus story).  Once one learns the trick however, it all goes smoothly

As the laying extended across the floor, with the varying light through the day and between days, the wisdom of the choice of this color has become increasingly evident.  Much thanks to Uma and Daniel who encouraged me to go boldly with Vintage Ash!

The hardest bit of this was making the small cabinet box that extends the counter top to the doorway. This was challenging and exacting but ended up with the counter levels exactly matching.  This is composed entirely of materials recycled from the demolition of that cursed peninsula.

The chronic leak from the old dishwasher led to water egress through the paper underlay of the old linoleum floor from  the door jamb to alongside the stove so that, apart from the repair  under the dishwasher, the floor, once exposed, needed a good deal of airing to dry out.  On this account alone, I am very glad that I took this project on.

Apart from that, the end effect is very pleasing and the kitchen area is now much more ergonomic  Some minor trim work is outstanding and I have to mill a joining strip between the two floors.  The new floor is 1/8 inch higher than the floor in the living area, so I will have to make this up myself.  The table saw will make that easy and I will use timber studs from the earlier demolition.as the stock for this.






1

Friday, March 22, 2013

UPDATE ON KITCHEN REMODEL

I HAVE MADE SOME PROGRESS, albeit quite demanding.  I have completed the cabinet box to extend the counter top, now that the dishwasher has been installed.  This pic shows the new washer, not actually installed at the time but just in place to confirm measurements for the construction of the cabinet.

It is actually more difficult to construct a box to match existing carpentry than to do it all of a piece from scratch, as it were.  I had to revive some skills not used for many years.

While I was busy with that work, Daniel came by and installed the dishwasher, as well renewing the 40 yer old plumbing and fitting a new faucet setup for the sink.  I had 14 1/2 inches for the new box.  I decided to retain the laminex top and to extend this over the cabinet box, using old material from the peninsular top.  The entire cabinet was constructed from these material.  Excellent recycling!

 Amazingly I got it almost exactly matching in height.  I am using an acrylic filler called SeamFil, to join everything up and make a smooth surface.
 As you can see, I have decided to go with the color on three of the walls making up the kitchen/dining/living area.  This is called 'Cloud Burst' and is a blue-gray hue to match the sky so often see hereabouts.

The rest of the cabinet doors and drawers will be done with this color since I like it so much. The framing will remain a wood stained hue but lightened.

Still asking the house to tell me how the rest of the room will be painted.  The Crushed Orange that you can see on the plinth and the door trim will find a place somewhere in this new scheme.

Now that I have a dishwasher that works, I suppose I will have to buy some crockery and cutlery to put in it from time to time.  Image, more than one spoon, two forks, four knives and five plates!

Working on how to do the floor.  Should have this more in shape over the next week or so.

Saturday, March 9, 2013

SMALL REMODEL OF THE KITCHEN AREA.

I GOT BACK TO CORNING just a month back, on the tail end of a winter storm.  I was lucky to make it into the local airport (Elmira, ELM), an hour or so before midnight, on the only flight to get in that day.  How nice it was to trudge through the eight inches of snow to my front door and to be home once more!

It took a week or so to gather in two and a half's months of mail and to become my Corning self.  Snow outdoors most of the time so I found the kitchen area staring me in the face.  Staring back, this is how it looked.  Hidden within the peninsula you see in the foreground was an ancient dishwasher that, with my few dishes to be washed straight after use, I had never used. It had  made strange noises when tested prior to the house purchase but did work.  However, I like to wash dishes by hand.

The plan was to remove the dishwasher, demolish the peninsulate extension, and extend the counter some 15 inches to abut the door jamb.  In fact, the demolition of the cabinet turned out to be first necessary.  The eventual removal of the dishwasher revealed that it had suffered a chronic, small hot water leak, resulting  in serious erosion of the sub-floor.

It was now evident that beneath the top layer of linoleum was a layer of ply covering an earlier layer of linoleum.  This presented some of repairing the floor so as to bring it to an equal level to the rest of the floor.  As the plywood layer immediately above the joists had been eroded, the first step was to use a cement based product to fill in the hollows.  As plywood thickness has altered a little since the construction of the original floor, it took two layers of plywood to effect a good repair.
 
After seeing an "almost-top-of-the-line" Maytag dishwasher marked down by $250 at the local Home Depot, I resiled from my disinterest in replacing the dishwasher, so now you see the new one, not yet installed but in place so I can be sure of the dimensions of the cabinet I will build to use the space towards the door.  I was very heartened by the good result of the floor repair and set about preparing the counter top for its extension over the proposed cabinet work.  This turned out to be technically more difficult than I had first thought and this has made the design and cabinet making rather more difficult.

The cabinet box will have a top drawer and lower door opening to two shelves and will closely match the other cabinets.  The drawer will hold cutlery and the shelves will take crockery to make easy the setting of the table for dinners I plan to have once all this is done.

Already I can see how I will have more useful counter top space and better access to the cupboards you can see above the dishwasher.  Also, the kitchen area is much easier to navigate. 

The construction of the cabinet has got to have been the difficult middle third of the project,  I have been working on it for the best part of a week, one way or another.  It is all ready not to be assembled and put in place with only the top drawer needing construction.  Once it is in place, around mid-week, Daniel will install the dishwasher and attend to some re-plumbing.  It is quite a while since I have taken on cabinet work and I seem to be having to relearn lots of stuff, made and recovered from a few simple errors, but have been able to make use of most of the material from the demolished cabinet.

With this work done, I will tile over the Formica top with linoleum tiles and do the finishing wood work.  I have no be able to make up my mind about colors. This will have to  await the laying of a new floor covering.  I have been excited to discover a floating linoleum covering that avoids pulling up the present layer and will lay very quickly. 

With a little luck and some hard work this week I may get all this done.  The Tuesday following St. Patrick's Day, I have a small operation scheduled for my right hand and that will take me out of kitchen action for almost a week.  This had turned out to be far more than the easy, straight forward task I had envisaged.  How like life!

Watch this space for the next update, which should show the completed cabinet work and the final tiling.





Tuesday, January 1, 2013

ROOF REPORT

THE ROOF IS DONE:  Just a brief report and to let you know that, this New Year's Day 2013, I have survived 2012 and am alive and well.  

Despite diffuculties weather-wise, Daniel has used brief windows of opportunity to install the new roof.  Here are some pics:

The first shows how batons or furlings are fixed to the existing roof (by screws through to the roof trusses) and then the roof segments screwed to the batons. Each seam of the roof overlays the preceeding member, clipping to it by means of interlocking ridges.  And so on, across the width of the roof, with no nails or screws visible, all hidden beneath each seam.





This is a view of the southern half of the roof



And here the front, or northern roof.



My friend Uma, having viewed the roof, commented that it has the effect of making the house seem larger.  This may be due to the polar white color bonded to the metal.

There are not many metal roofs in Corning



Since the work was completed, just after Christmas we had a good snow fall. This is the view from the rear alley.

We have discovered that the roof is quite slippery so far as snow is concerned so that, when the temperature rises, despite the low pitch, it quickly sheds the load of snow.  As Daniel lwas leaving after an inspection, the entire covering of snow came off the rear roof.  Most had gone from off the front, so the roof was bare of snow, unlike the more usual roofs all about.

So, my friends, you have seen as much of the new roof as have I.  In three weeks, I will be winging my way back to the US and, after one or two visits on the west side and in Colorado, I will be back in Corning to see it all for myself, on February 8th.  Health and Happiness to all of you for 2013.

Saturday, December 1, 2012

A LONG WAY FROM THE HOUSE

SO HERE I AM in Adelaide Airport, South Australia; a long way from home, so to speak.

UPDATE ON  'FIX THE SUNROOM': Over the weekend prior to leaving for Oz, I completed the last project needing to be done before Winter.  Recall this aimed at fixing two problems: a slight problem with water seepage into the Sun-Potting room and the need to get more sunlight into this room during the cold months.  At right, you can see the dampness problem at its worst>

I have tackled this by digging out the topsoil around the foundation walls, laying down a waterproof membrane, and replacing the soil with a more porous gravelly mix.  This surely has fixed the water problem  and I now have a heap of topsoil to be used elsewhere in the garden.

The problem with the light during the cold months is the acute angle of the sun's rays.  These fall mainly onto the rear walls of the room.  As report in my last posting, I have concreted around the southern walls and planned to place off-white tiles over the slabs, extending out about four feet.  The theory is that sunlight striking these tiles will be reflected up through the windows and onto the ceiling, then to be scattered around the room.  We shall see just how effective this is when I return in early February.  Below is the completed job.

While I am away Daniel will be fixing a new roof.  Since painting the roof white, we have had trouble with a series of minor leaks, especially when the wind is in the north (the direction of the worst weather) which seems to have acted to lift the composite bituminous tiles (low pitch roofs act somewhat like wings, producing a lower pressure above the roof than below, within the attic space).  Despite all our efforts, we have not been able to fix this annoying problem and this has meant that I have not been able fully to insulate the space above the entrance hall and stairs.

So, when I return, a steel decking room colored polar white will welcome me.  This will be secret nailed to batons or furring strips that fixed through the current roof to the roof trusses.  This is lighter than covering the old tiles with new and will create an insulating layer of air between the old and new roofs.

Monday, October 15, 2012

A NEW PROJECT

A SLIGHT PROBLEM WITH THE 'ROOM UNDER THE DECK' has been a small amount of moisture entering as vapour and condensing as a very light dew... just some patches appearing on the western wall.  This is despite the waterproofing applied to the below-grade walls.  Apparently the soil under the stairway up to the deck becomes water logged and four feet of water is generates quite a bit of pressure.

Additionally, it would be very nice if I could get more sunlight into this room during the cooler months, especially early Spring when I plan to be growing seedlings and nurturing young plants, this despite that it has the equivalent of four windows facing to the South.

I have decided to solve both problems by digging out the soil surrounding the potting room walls, down to about eight inches (20 cm), then laying in some six inches of a gravel-sand fill over plastic membrane.

  I have completed the excavation and the remaining soil has a two inch/70 inch slope southwards and eastwards, leading to a shallow east to west trench.  I expect this to take away all the water that results even from heavy rains.  This will ensure dry soil around the walls but will not help with the problem of getting more light, and therefore heat, into the room.  It took several days to dig out the top soil.  I have included a picture of the resulting pile.

I think I can solve the 'more light' by paving out from the southern wall some three feet (c. one metre) with off-white tiles.  At the winter solstice (sun at the lowest angle of 42 deg. to the horizon) I calculate that the tiles will reflect light up to about half of the ceiling (which is lined, insulated, and painted off white).  This should assist with the heating of the room through late Winter and early Spring as the sun begins to rise to a higher meridian.  At the least, it will make the room even more pleasant to sit in on the days we have sufficient sun.  Of course, the heated floor will be great on other days.


I am awaiting the arrival of the gravel sand mix as I write this and am very pleased with progress on the project to date.  Soon I will be trundling the stuff by wheel barrow up to the work place!  When finished, besides the tiling, I will have paved in front of the stairs up to the deck and also the stairs going down to the room.  I have ordered up about twice as much mix as I need for this job; the remainder will be handy for other paving jobs around the house.  It costs $75 for delivery, up to ten  (non-metric) tons and $10 per ton,  so it a matter of simple economics to have a bit more than I strictly need for this project.  The next post will tell how the project went.